A Supplier Verification Checklist Before You Place an Order

Liking a supplier from their catalogue or quotation is easy; verifying them before ordering is a job in its own right. The checklist below sets out what should be checked and asked before the first order goes out. No single item is sufficient on its own, but together they reduce risk significantly.
Official documents and identity checks
Ask the supplier to establish their existence on paper first: business registration, tax code and trade register details. Check that the company name, address and authorised person on those documents match your correspondence. If you only receive photographs of documents, request current, legible and complete copies.
The core items to review are:
- Business registration certificate and its status
- Tax code matching the company name used in correspondence
- Clear identity of the signatory or main contact person
- Export registrations and permits required for your target market
Consistency across documents is where impersonators most often fail. Cross-checking against third-party sources such as chamber of commerce records is always more reliable than self-declared information.
The first contact itself is a data point. Replies that are structured and answer technical questions specifically are a better signal than fast but vague answers. Send the same question set to every candidate and compare the depth of the responses. If you will need a working language other than English, plan for translation support from the start; misunderstandings tend to surface at the most expensive moment.
Bank account and payment security
The bank account you pay into should match the supplier's registered company name. If the account holder differs, request a written explanation and bank confirmation before transferring. Payments to a third individual or to an account in an unexpected country are among the hardest problems to unwind.
Clarify before paying:
- Is the account holder name identical to the company name?
- Who bears transfer fees and deductions, and in which currency?
- Can you get written confirmation of the exchange rate applied and any additional charges?
On the invoice side, check consistency as well: the company name on the proforma invoice should match the final invoice, and the product description and unit price should line up with the order form. Confirming buyer name, amount, currency and reference number in writing before paying is the simplest guard against transfers to the wrong account.
With a new supplier, a higher deposit at the start is normal; in return, get the payment schedule, delay remedies and revision conditions in writing. For higher order values, bank-guaranteed instruments such as a letter of credit can be considered. Choose the method according to the order value and the habits of both parties.
The factory visit and capacity check
There is always a difference between judging remotely and standing on the production floor. If possible, arrange a factory visit before ordering; if that is not possible, at least run a live video walkthrough. Look beyond the machine count at raw material and work-in-progress storage, how labour is spread across shifts, and the quality control stations.
What to look at on site:
- General condition of machinery and maintenance routines
- Whether stock levels in the warehouse match the claimed capacity
- Whether quality control stations are actually in use
- Orderly archiving of samples, tooling and quality records
Ask for capacity figures backed by a production plan: monthly output, fill rate and seasonal peaks. Work with suppliers who explain capacity with its reasoning, not those who simply quote the number you wanted to hear.
Sub-contracting red flags and contract basics
Some suppliers pass parts of production to sub-contractors; that is not inherently wrong, but uncontrolled it creates quality and lead-time risk. Settle this before ordering: which stages are produced in-house, which are outsourced, and will sub-contractor changes be notified in writing?
The basic contract items are:
- Scope, specification and acceptance criteria
- Price, revision conditions and payment schedule
- Lead time and obligations in case of delay
- Confidentiality, intellectual property and dispute procedure
Terms in the quotation and terms on the order form must not contradict each other. If they do, confirm in writing which text prevails; verbal promises are hard to prove later.
Conclusion
Verification is not a formality completed once, but a habit repeated with every new supplier. Closing the document, payment, factory and contract items before ordering prevents problems that become far more expensive to fix later. As your product and volumes become clear, you can add these verification steps to your questions when you send your request through the Request a Quote page.



